<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
  <title>SKYE @ TUAS — Insights &amp; News</title>
  <link>https://skye-tuas.com.sg/blog</link>
  <description>News, market insights and buyer guides from SKYE @ TUAS.</description>
  <language>en-sg</language>
  <atom:link href="https://skye-tuas.com.sg/feed.xml" rel="self" type="application/rss+xml"/>
  <lastBuildDate>Sun, 18 Oct 2026 09:00:00 +0800</lastBuildDate>
  <item>
    <title>How the Omega 1 Tuas Facility Is Structured</title>
    <link>https://skye-tuas.com.sg/blog-omega-1-tuas-structure-and-land-use-explained</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-omega-1-tuas-structure-and-land-use-explained</guid>
    <description>EdgeProp reported on 25 September 2026 how Omega 1 Singapore, a five-storey Tuas smart logistics facility, is structured and what it adds.</description>
    <pubDate>Sun, 18 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>37 Emerald Hill: Dates From 1925 to 2027</title>
    <link>https://skye-tuas.com.sg/blog-emerald-hill-tender-timeline-1925-to-2027</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-emerald-hill-tender-timeline-1925-to-2027</guid>
    <description>A dated timeline of 37 Emerald Hill, from its 1925 Main Block to the 16 March 2027 close of the Singapore Tourism Board tender.</description>
    <pubDate>Sat, 17 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>A Singapore-Based Chief for Frasers Industrial</title>
    <link>https://skye-tuas.com.sg/blog-singapore-based-chief-frasers-industrial</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-singapore-based-chief-frasers-industrial</guid>
    <description>Quick take: Frasers Property Industrial gets a Singapore-based chief, Jai Mirpuri, from 11 January 2027, plus Stacked Homes notes on office tenants.</description>
    <pubDate>Thu, 15 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Buyer Q&amp;A on a Record Investment Year</title>
    <link>https://skye-tuas.com.sg/blog-buyer-qa-on-a-record-investment-year</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-buyer-qa-on-a-record-investment-year</guid>
    <description>Buyer questions on Singapore&#x27;s record 2026 investment sales and the $2b industrial quarter, answered for SKYE @ TUAS.</description>
    <pubDate>Tue, 13 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>From 6 October to 13 November: A Changi EOI</title>
    <link>https://skye-tuas.com.sg/blog-changi-south-eoi-6-october-13-november-timeline</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-changi-south-eoi-6-october-13-november-timeline</guid>
    <description>The dated sequence behind a Changi South factory EOI at an indicative $12.8 million, from EdgeProp&#x27;s 6 October report to the 13 November close.</description>
    <pubDate>Sat, 10 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Three Myths About the September PMI</title>
    <link>https://skye-tuas.com.sg/blog-skye-tuas-pmi-myths-checked</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-skye-tuas-pmi-myths-checked</guid>
    <description>Three common misreadings of the 51.7 manufacturing PMI, checked against the facts, with the SKYE @ TUAS project details alongside.</description>
    <pubDate>Fri, 09 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>SKYE @ TUAS in Seven Numbers</title>
    <link>https://skye-tuas.com.sg/blog-skye-at-tuas-in-seven-numbers</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-skye-at-tuas-in-seven-numbers</guid>
    <description>Nine levels, about 309 units, 12.95 m ceilings, 25 kN/m2 loading and a link bridge to Tuas Link MRT: seven numbers behind SKYE @ TUAS.</description>
    <pubDate>Wed, 07 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Which Level Suits You at SKYE @ TUAS?</title>
    <link>https://skye-tuas.com.sg/blog-which-level-skye-tuas-buyer-guide</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-which-level-skye-tuas-buyer-guide</guid>
    <description>Choosing a level in a nine-storey industrial building: drive-up access, heavy-vehicle decks and ceiling height, and what to ask first.</description>
    <pubDate>Tue, 06 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Two Heavy-Vehicle Decks: Four Questions</title>
    <link>https://skye-tuas.com.sg/blog-skye-tuas-two-heavy-vehicle-decks-four-questions</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-skye-tuas-two-heavy-vehicle-decks-four-questions</guid>
    <description>Four questions an operator asks about SKYE @ TUAS: two heavy-vehicle decks, drive-up access to every floor, and what to check before registering.</description>
    <pubDate>Mon, 05 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Leasing Out on a 30-Year Clock</title>
    <link>https://skye-tuas.com.sg/blog-skye-tuas-leasing-out-30-year-leasehold-lease-clock</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-skye-tuas-leasing-out-30-year-leasehold-lease-clock</guid>
    <description>Planning tenancies around the lease clock when you own a unit on a 30-year leasehold: timing, tenant terms and exit, with SKYE @ TUAS as context.</description>
    <pubDate>Sun, 04 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>What Goes On Inside a B2 Industrial Unit?</title>
    <link>https://skye-tuas.com.sg/blog-what-goes-on-inside-a-b2-industrial-unit</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-what-goes-on-inside-a-b2-industrial-unit</guid>
    <description>A plain-English look at what B2 industrial units are generally used for, who occupies them, and how SKYE @ TUAS at Tuas Link Close fits the picture.</description>
    <pubDate>Sat, 03 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Reading Tuas as a Place to Run Operations</title>
    <link>https://skye-tuas.com.sg/blog-tuas-for-occupiers-trucks-and-trains</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-tuas-for-occupiers-trucks-and-trains</guid>
    <description>Tuas suits freight-heavy operators, but staffing matters too. A location-first look at roads, port, rail and what to test before choosing a western base.</description>
    <pubDate>Fri, 02 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>From 2Q Rents to 2027: A Tuas Timeline</title>
    <link>https://skye-tuas.com.sg/blog-from-2q-rents-to-2027-tuas-timeline</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-from-2q-rents-to-2027-tuas-timeline</guid>
    <description>Industrial rents hit a 30-year high in 2Q2026. A timeline of what comes next, from the third-quarter data to the 2027 completion of SKYE @ TUAS.</description>
    <pubDate>Thu, 01 Oct 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Three Takeaways From a $105m Tai Seng Sale</title>
    <link>https://skye-tuas.com.sg/blog-three-takeaways-105m-tai-seng-sale</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-three-takeaways-105m-tai-seng-sale</guid>
    <description>A quick read on the $105 million freehold Kampong Ampat tender, and how it contrasts with a 30-year leasehold factory in Tuas.</description>
    <pubDate>Tue, 29 Sep 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Green Financing Reaches Industrial: What It Means in the West</title>
    <link>https://skye-tuas.com.sg/blog-green-financing-tuas-industrial</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-green-financing-tuas-industrial</guid>
    <description>As green loans become standard for Singapore developers, future-ready industrial space in the Tuas corridor is well aligned with the trend.</description>
    <pubDate>Fri, 03 Jul 2026 09:00:00 +0800</pubDate>
  </item>
  <item>
    <title>Why ramp-up design changes the economics of industrial space</title>
    <link>https://skye-tuas.com.sg/blog-ramp-up-advantage</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-ramp-up-advantage</guid>
    <description>How drive-up access to every floor at SKYE @ TUAS removes loading bottlenecks, cuts handling time and turns upper floors into ground-floor operations.</description>
  </item>
  <item>
    <title>Tuas: how the West became Singapore’s industrial growth engine</title>
    <link>https://skye-tuas.com.sg/blog-tuas-corridor</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-tuas-corridor</guid>
    <description>From the Tuas Mega Port to the Second Link, here’s why the western corridor anchors long-term demand for modern industrial space like SKYE @ TUAS.</description>
  </item>
  <item>
    <title>Future-proofing a factory: ceilings, loading and the power to grow</title>
    <link>https://skye-tuas.com.sg/blog-future-ready-specs</link>
    <guid isPermaLink="true">https://skye-tuas.com.sg/blog-future-ready-specs</guid>
    <description>A practical look at the specifications that let a unit at SKYE @ TUAS flex from factory to warehouse and scale into power-intensive production.</description>
  </item>
</channel>
</rss>
